Prestress/Post-Tensioning Strand Systems

Avar Construction Systems, Incorporated

ACS 7.5

Last edit date: 3/20/2024

GENERAL

Bar or Tendon Size Strand Diamter Ultimate (kips) Concrete Strength(psi) PJack (kips)
7 1/2" 289.1 3500 217

WEDGES

Wedges Length Material Wedge Parts Wedge Angle Wedge Inside DiameterBABA Act Information*
1.46" AISI 11L172 Unconfirmed
1.46" AISI 12L142 Unconfirmed

ANCHOR HEADS

Anchor Heads Size Material Authorization DateBABA Act Information*
4.500" Ø x 2.750" ASTM -A536 Gr 80-55-0612/17/1996Unconfirmed
Wedge hole angle: 6° 55'
Wedge hole diameter: 1.035"
Strand hole diameter: 0.562"

BEARING PLATES

Bearing Plates Size Material Authorization DateBABA Act Information*
6.500" Square x 5.250" (MP ) ASTM-A536 Gr 80-55-0612/17/1996Unconfirmed
Bearing hole diameter: 2.937"
Spiral size and turns: #3-5 Turn

TRUMPETS

Trumpets Size Material Authorization DateBABA Act Information*
There are no trumpet components for this system at this time

DUCTS

Ducts Size Material Authorization DateBABA Act Information*
There are no duct components for this system at this time

SPIRAL

#3 Rebar 8" O.D , 5 Turn @ 2" Pitch

Caltrans contact: Jim Ma, Concrete Committee Chair, jim.ma@dot.ca.gov

*As attested to by the supplier as of April 14, 2026 per definition in 2 CFR 184 and 23 CFR 635.410. Stakeholders should use this information in conjunction with corresponding Caltrans special provision section 6-1.04 to understand applicable requirement for the project.

The California Department of Transportation (Caltrans) is implementing statutory changes required by the Bipartisan Infrastructure Law -Build America, Buy America Act (BABA), as outlined in 2 CFR 184 and 23 CFR 635.410.

https://www.fhwa.dot.gov/construction/cqit/buyam.cfm