Prestress/Post-Tensioning Strand Systems

Schwager Davis Incorporated

SDI C4.6 (D)

Last edit date: 3/20/2024

GENERAL

Bar or Tendon Size Strand Diamter Ultimate (kips) Concrete Strength(psi) PJack (kips)
4 0.6" 234 6000 176

WEDGES

Wedges Length Material Wedge Parts Wedge Angle Wedge Inside DiameterBABA Act Information*
1.80" 2 0.62"Unconfirmed

ANCHOR HEADS

Anchor Heads Size Material Authorization DateBABA Act Information*
ASTM A536 GR 80-55-064/23/2003Unconfirmed
Wedge hole angle:
Wedge hole diameter:
Strand hole diameter:

BEARING PLATES

Bearing Plates Size Material Authorization DateBABA Act Information*
There are no bearing plate components for this system at this time
Bearing hole diameter:
Spiral size and turns: none

TRUMPETS

Trumpets Size Material Authorization DateBABA Act Information*
galvanized steelUnconfirmed

DUCTS

Ducts Size Material Authorization DateBABA Act Information*
2" I.D. galvanized spiroUnconfirmed

SPIRAL

-

Caltrans contact: Jim Ma, Concrete Committee Chair, jim.ma@dot.ca.gov

*As attested to by the supplier as of April 14, 2026 per definition in 2 CFR 184 and 23 CFR 635.410. Stakeholders should use this information in conjunction with corresponding Caltrans special provision section 6-1.04 to understand applicable requirement for the project.

The California Department of Transportation (Caltrans) is implementing statutory changes required by the Bipartisan Infrastructure Law -Build America, Buy America Act (BABA), as outlined in 2 CFR 184 and 23 CFR 635.410.

https://www.fhwa.dot.gov/construction/cqit/buyam.cfm